How pricing works
Last updated 2026-10-19
What changes the number
- Unit mix: rooms per unit, kitchens or none, suites for supervisors.
- Code type: non-coded crew unit or HUD-code.
- Quantity and phasing: how many units and in what delivery sequence.
- Distance and route: oversize loads from Breckenridge, TX to your site.
- Site conditions: pad readiness, access, and where utilities stub in.
- Options: finishes, furnishings, skirting, steps, and decks.
What turnkey includes
| Manufacturing | Units are built in Breckenridge, TX to the plan and spec sheet on your contract: room count, baths, kitchen layout, and code type (non-coded crew unit or HUD-code). |
|---|---|
| Delivery and transport | Each unit travels from Breckenridge, TX to your site as an oversize load, delivered in the sequence set in your proposal. Our team handles permits, delivery, and setup from start to finish. |
| Setup | Units are set on your prepared pad, leveled, blocked, and anchored. PTAC heat-and-air units ship loose and are installed on site. |
| Utility hookups | We connect each unit to the water, wastewater, and power service at the pad, so the building is ready to occupy once inspections clear. |
| Project management | One contract and one point of contact for the schedule, delivery sequencing, and coordination with your site contractor, utilities, and inspectors. |
You provide the land. Our team handles permits, delivery, and setup from start to finish, and coordinates pads, roads, and utility service to each pad. Your proposal lists the full scope for your site.
From inquiry to move-in
We do not publish prices or promise dates on the website. Every project follows these steps:
- Inquire. Send the form with worker count, location, and start date.
- Unit mix and site check. We confirm the models, room count, and code type, and what the site needs at each pad.
- Proposal and contract. A written proposal with the turnkey scope, unit list, and schedule assumptions.
- Build slot. Units are built to order in Breckenridge, TX. Ask about current availability; your proposal shows the build and delivery sequence.
- Permits and site prep. Our team lines up transport and site permits while base pads are laid out during the build. Site readiness usually sets the pace.
- Delivery and setup. Units arrive in the agreed sequence and are set, leveled, anchored, and connected.
- Walkthrough and handover. Final walkthrough, punch list, and handover so your inspections and move-in can proceed.
Weighing options first? Read what drives cost per bed and buy vs. lease vs. hotel.
Common questions
Why don’t you publish prices?
Unit mix, code type, quantity, delivery distance from Breckenridge, TX, and site conditions change every project. A posted number would not match your job, so we send a written proposal instead.
What does a proposal include?
The unit list and specs, the turnkey scope (manufacturing, delivery, setup, utility hookups, project management), what the site side must provide, and the schedule assumptions.
What do you need from me?
Worker count, location, start date, how long you need the beds, and whether rooms are private or shared. Use the form; Amount of Units can be a rough number.
Is there a cost to inquire?
No.
What happens after you inquire
- Our team reviews your project details and replies within one business day.
- We contact you to confirm your needs: headcount, site, and schedule.
- We prepare options for your project.
See our privacy policy.