Crew housing units for Colorado job sites

Workforce Housing Direct delivers turnkey workforce housing across Colorado: crew units built in Breckenridge, Texas, then delivered, set, and connected to utilities, with project management included and no broker markup. We serve DJ Basin oil and gas in Weld County and the Global AI data center near Windsor. Inquire with your county, headcount, and start date.

We build crew units in Breckenridge, TX and deliver, set, and connect them in Colorado under one contract. Weld County is the center of DJ Basin oil and gas work, construction is its largest industry by jobs, and a proposed AI data center near Windsor plans about 1,500 construction jobs. Colorado regulates HUD-code and factory-built structures separately.

Where we deliver in Colorado

HubCounty / parishRoad miles from Breckenridge, TXWhy it matters
GreeleyWeld County747DJ Basin hub
WindsorWeld County753Global AI data center site
Fort CollinsLarimer County760Northern Front Range
DenverDenver County717Metro base; mountain routes add restrictions
Colorado SpringsEl Paso County649Southern Front Range

Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.

What is driving workforce housing demand in Colorado

Weld County and the DJ Basin

Construction was Weld County’s largest industry in 2023 with 13,643 jobs (11.7%), and the county projects 32,034 more jobs by 2050 [1]. Oil and gas crews working the DJ Basin base out of Greeley and the surrounding towns.

Global AI data center near Windsor

Global AI plans to convert a former Kodak facility near Windsor in unincorporated Weld County into a data center that starts at 27.5 MW with plans up to 1 GW [2]. The company says the project will create over 1,500 construction jobs [3]. The county issued stop-work orders in 2026 over unpermitted construction, so schedules here depend on permits [2].

Bracketed numbers refer to the sources at the bottom of the page.

Colorado rules that affect crew housing

Colorado’s Division of Housing requires anyone installing a HUD-code manufactured home to register with its installation program, and runs a separate factory-built structures program for non-HUD buildings [4][5]. That matters for non-coded crew units: confirm with us how the units will be certified for your Colorado site before you order.

Turnkey scope in Colorado

ManufacturingUnits are built in Breckenridge, TX to the plan and spec sheet on your contract: room count, baths, kitchen layout, and code type (non-coded crew unit or HUD-code).
Delivery and transportEach unit travels from Breckenridge, TX to your site as an oversize load, delivered in the sequence set in your proposal. Our team handles permits, delivery, and setup from start to finish.
SetupUnits are set on your prepared pad, leveled, blocked, and anchored. PTAC heat-and-air units ship loose and are installed on site.
Utility hookupsWe connect each unit to the water, wastewater, and power service at the pad, so the building is ready to occupy once inspections clear.
Project managementOne contract and one point of contact for the schedule, delivery sequencing, and coordination with your site contractor, utilities, and inspectors.

You provide the land. Our team handles permits, delivery, and setup from start to finish, and coordinates pads, roads, and utility service to each pad. Your proposal lists the full scope for your site.

Models and suggested mix

ModelSizeRooms / bathsKitchenCode
16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16 × 76 ft5 rooms / 5One shared full kitchen, center of the unitNon-coded crew unit
16×76 HUD-Code 5-Bed, 5-Bath Unit (Shared Kitchen)16 × 76 ft5 rooms / 5One shared full kitchenHUD-code manufactured home
16×76 4-Suite Unit (Four Full Kitchens)16 × 76 ft4 rooms / 4Four full kitchens, one per suiteNon-coded crew unit
16×60 4-Suite Kitchenette Unit16 × 60 ft4 rooms / 4Four kitchenettes (cooktop, microwave, small refrigerator)Non-coded crew unit
16×76 5-Room Sleeper (No Kitchen)16 × 76 ft5 rooms / 5None (pair with a dining hall or catering)Non-coded crew unit
7-Room High-Density Sleeper16 × 76 ft7 private rooms / 7NoneNon-coded crew unit (custom build)
6-Room Crew Unit16 × 76 ft6 private rooms / 6Sleeper (no kitchen) or with a shared kitchenNon-coded crew unit
4-Room, 4-Bath Crew Unit16 × 76 ft4 private rooms / 4VariesNon-coded crew unit
4-Room Unit with Shared Kitchen & Laundry16 × 76 ft4 private rooms / 4Shared kitchen and laundryNon-coded crew unit
HUD-Code 4-Bed, 4-Bath Home16 × 76 ft4 bedrooms / 4Central kitchen and livingHUD-code manufactured home (TDHCA)
4-Bed, 4-Bath Shared Living Unit16 × 76 ft4 bedrooms / 4Shared kitchen and livingAsk: available coded or non-coded

No prices are published; inquire with your headcount and we will recommend a unit count.

Delivery logistics into Colorado

Units travel as 16 ft wide oversize loads on CDOT permits, and mountain routes add restrictions. Our team handles permits, delivery, and setup from start to finish. Counties set zoning and use permits (Weld County uses a Use by Special Review process for many land uses), and on-site wastewater needs county approval.

From inquiry to move-in in Colorado

We do not publish prices or promise dates on the website. Every project follows these steps:

  1. Inquire. Send the form with worker count, location, and start date.
  2. Unit mix and site check. We confirm the models, room count, and code type, and what the site needs at each pad.
  3. Proposal and contract. A written proposal with the turnkey scope, unit list, and schedule assumptions.
  4. Build slot. Units are built to order in Breckenridge, TX. Ask about current availability; your proposal shows the build and delivery sequence.
  5. Permits and site prep. Our team lines up transport and site permits while base pads are laid out during the build. Site readiness usually sets the pace.
  6. Delivery and setup. Units arrive in the agreed sequence and are set, leveled, anchored, and connected.
  7. Walkthrough and handover. Final walkthrough, punch list, and handover so your inspections and move-in can proceed.

Industries we serve in Colorado

Oilfield crew housingData center workforce housingPipeline crew housingConstruction megaprojectsH-2A farmworker housingUtility and storm crews

Other states: OklahomaNew MexicoLouisianaSouthern Kansas Texas Full service area

Common questions

Do you deliver crew housing to Colorado?

Yes. Colorado is in our full turnkey service area: built in Breckenridge, TX, delivered, set, connected, and project-managed under one contract.

Who regulates manufactured and factory-built buildings in Colorado?

The Colorado Division of Housing. HUD-code installers must register with its installation program, and non-HUD factory-built structures follow its separate program.

Who permits septic for a crew camp in Colorado?

Counties and local public health agencies permit on-site wastewater systems of 2,000 gallons per day or less under CDPHE Regulation 43. Larger systems go through CDPHE design review and approval.

Why does the Windsor data center schedule matter for housing?

Weld County issued stop-work orders over unpermitted construction in 2026, so crew arrival dates can move. Owned units can be held or redeployed if the start slips.

How far is Colorado from where the units are built?

Units are built in Breckenridge, TX. By road, Colorado Springs is about 649 miles and Fort Collins about 760 miles from the build site (OpenStreetMap routing, Oct 19, 2026).

Sources

  1. Weld County, draft Housing Needs Assessment (checked Oct 19, 2026)
  2. Colorado Public Radio, “Weld County officials have told an AI company to stop construction on a new data center. Three times.” (Aug 7, 2026)
  3. Global AI, Weld County project page (checked Oct 19, 2026)
  4. Colorado Division of Housing, Building Contractor – HUD Code Homes (checked Oct 19, 2026)
  5. Colorado Division of Housing, Factory Built Structures (checked Oct 19, 2026)
  6. CDOT, COOPR oversize/overweight permitting (checked Oct 19, 2026)
  7. CDPHE, On-site wastewater treatment systems (Regulation 43) (checked Oct 19, 2026)

Last updated 2026-10-19. Figures are as published by each source on the date shown; re-check before you budget.

Inquire for your Colorado project

Our team replies within one business day.

What happens after you inquire

  1. Our team reviews your project details and replies within one business day.
  2. We contact you to confirm your needs: headcount, site, and schedule.
  3. We prepare options for your project.