(830) 354-6730 Inquire

We sell crew housing units to companies and landowners. We don’t rent rooms or beds.

Home › Texas › Projects › Fairfield

Fairfield, TX data center crew housing for CyrusOne Freestone

We sell crew housing units to companies and landowners. We don’t rent rooms or beds.

CyrusOne is building three data center buildings, about $1.5 billion in total, on FM 488 beside the Freestone Energy Center outside Fairfield, with 380 MW for phase 1 and 380 MW more planned. Two buildings were under construction in July 2026 and the set is scheduled to finish at the end of August 2027. Subs and Freestone County landowners can buy new crew units outright from us; we have no beds for rent.
About 45 units per monthaverage capacity, depending on the production schedule
1 contractbuild, deliver, set, and connect utilities

Final schedules depend on site work, permits, and utilities. How fast we can deliver · Timeline · Bulk orders · Inquire

The Freestone campus in brief

LocationFM 488 beside the Freestone Energy Center, outside Fairfield · Central Texas
DeveloperCyrusOne [2]
Power380 MW phase 1; 380 MW more planned (Constellation deal) [4]
BuildingsDFW20A, B, C: 306,215 sq ft each, about $1.5 billion [1]
ScheduleFinish targeted end of Aug 2027 [1]
Phase 2218.1 acres west of FM 488; reinvestment zone hearing Jun 17, 2026 [3]
CoolingClosed loop, about 1,000 gal per building per day [3]
TenantNot named [1]

What CyrusOne is building on FM 488

CyrusOne is putting up a data center campus beside the Freestone Energy Center outside Fairfield. In February 2026 CyrusOne and Constellation announced a deal that supports 380 MW for the first phase, with another 380 MW planned for a second[4]. State filings reported by DatacenterDynamics describe three buildings, DFW20A, DFW20B, and DFW20C, at 306,215 sq ft each, or about 918,650 sq ft in total, on FM 488, with a combined value of about $1.5 billion[1].

The same report said two of the buildings were already under construction in July, the third was set to start in August 2026, and the work was scheduled to wrap up at the end of August 2027. No tenant has been named[1].

Phase 2 and the local record

The Freestone County Times covered a June 17, 2026 hearing on a reinvestment zone for a second phase: 218.1 acres on the west side of FM 488. At that meeting the company described about 40 permanent jobs per building and a closed-loop cooling system using roughly 1,000 gallons per building per day[3]. CyrusOne’s own page talks about hundreds of construction jobs, a local career fair, and scholarships at TSTC[2].

Inquire Planning beds for a crew here? Tell us the headcount.

Where Fairfield crews sleep

Fairfield is a small county seat, and a campus moving this fast pulls crews from a wide circle. Teague is about 10 road miles away, Mexia about 22, and Corsicana, the biggest hotel market nearby, about 33[5]. Two buildings going up at once, a third behind them, and a second phase in the pipeline make for a long stretch of demand on a thin room supply.

Workers should ask their employer where the crew is housed. Employers have two real options: rent rooms by the night in those towns, or own beds on land close to FM 488.

For electrical and mechanical subs

The trades that carry a data center from shell to commissioning are the ones that stay. We build crew units new in Breckenridge, TX and deliver them turnkey to a pad you control near Fairfield: hauled, set, and hooked up under one contract. Mixes that suit this job:

  • Electricians working the August 2027 finish on two shifts: five-room sleepers so each worker has a private room.
  • A 25-person mechanical crew that does its own cooking: five shared-kitchen crew units.
  • Commissioning agents and owner’s reps on site into phase 2: four-suite units with full kitchens.

Units: 16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)7-Room High-Density Sleeper16×76 4-Suite Unit (Four Full Kitchens)

For Freestone County landowners

A ranch or lot within a short drive of FM 488 can host a contractor’s crew. You buy the units and set the terms; we sell, we don’t lease or manage a camp. Get the wastewater answer first: rural sites in Texas need an on-site sewage permit sized to the daily flow of the beds you plan[7]. If three or more workers will live there longer than three days, read the TDHCA rules on licensed migrant labor housing before you sign anyone up[6]. See crew housing for RV park and camp operators.

Delivery from Breckenridge

Fairfield sits about 209 road miles from our plant[5]. Units travel on a TxDMV oversize permit with each unit on its own axles[8]. CyrusOne has a second Texas build at Thad Hill in Bosque County; see Bosque County data center crew housing.

Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.

Common questions

What is CyrusOne building in Fairfield, Texas?

A data center campus on FM 488 next to the Freestone Energy Center: three buildings of 306,215 sq ft each, about $1.5 billion in total per state filings reported by DatacenterDynamics.

How much power will the Freestone data center use?

CyrusOne and Constellation announced 380 MW for the first phase, with an additional 380 MW planned for phase 2.

When will the Fairfield data center be finished?

The filings reported in July 2026 schedule the three buildings to finish at the end of August 2027. A second phase on 218.1 acres west of FM 488 is planned.

Does the Freestone campus use a lot of water?

The company told a June 2026 hearing it uses closed-loop cooling at roughly 1,000 gallons per building per day, according to the Freestone County Times.

Can I rent a room near the Fairfield data center from you?

No. Ask your foreman about lodging. We are a manufacturer: our crew units go to the contractors on the campus and to nearby landowners, who fill them.

Which towns are closest to the CyrusOne Freestone site?

Fairfield, then Teague about 10 road miles away, Mexia about 22, and Corsicana about 33.

Sources

  1. DatacenterDynamics, “CyrusOne files to develop three buildings for $1.5bn data center campus in Fairfield, Texas” (Jul 31, 2026)
  2. CyrusOne, Freestone County, Texas data center page (checked Nov 20, 2026)
  3. Freestone County Times, “Concerns raised, addressed regarding data center construction in Freestone County” (checked Nov 20, 2026)
  4. CyrusOne and Constellation, agreement for a data center at the Freestone Energy Center (Feb 9, 2026)
  5. OpenStreetMap routing (OSRM), road miles between town centers (mapped Nov 20, 2026)
  6. TDHCA Migrant Labor Housing Facility license application (2+ families or 3+ workers for more than 3 days; application fee set on the current form) (checked Oct 2026)
  7. TCEQ, On-Site Sewage Facilities (septic) permitting (checked Nov 20, 2026)
  8. TxDMV Oversize/Overweight permits (checked Oct 2026)

Last updated 2026-11-20. Figures are as published by each source on the date shown; re-check before you budget.

Inquire Tell us your headcount, site, and start date.

Related

Data center workforce housing Texas project tracker Stargate AbileneVantage FrontierWheeler County workforce hub (Pampa data center)Haskell County data center (Maverick Workforce Hub)Childress data centers (IREN and Crusoe)Galaxy Helios (Afton)Fermi America Project MatadorGoodnight campus (Claude)

Inquire about crew housing near Fairfield

Our team replies within one business day.

What happens after you inquire

  1. Our team reviews your project details and replies within one business day.
  2. We contact you to confirm your needs: headcount, site, and schedule.
  3. We prepare options for your project.

See our privacy policy.