Hudspeth County data center crew housing near Desert Haven

We sell crew housing units to companies and landowners. We don’t rent rooms or beds.

ServerDomes Global plans a data center on private land in Desert Haven, Hudspeth County, valued at about $15 billion by the county and $10 billion by DatacenterDynamics. The county judge expects about 800 construction jobs over four to five years and said construction could start as early as 2027; DCD reported in November that it had started. Contractors and landowners can buy crew units from us; we don’t rent beds.
About 45 units per monthaverage capacity, depending on the production schedule
1 contractbuild, deliver, set, and connect utilities

Final schedules depend on site work, permits, and utilities. How fast we can deliver · Timeline · Bulk orders · Inquire

The Desert Haven project in brief

LocationPrivate property in the Desert Haven community, Hudspeth County · El Paso & Far West Texas
DeveloperServerDomes Global, Boise, ID [1]
ValueAbout $15 billion (county, KVIA); $10 billion (DCD) [1]
Campus350 MW, up to 10 domes, about 700 of 2,000 acres [3]
Construction jobsAbout 800 over 4–5 years [2]
Permanent jobs200–300 [2]
Power and waterOwn power on site; water drawn once at startup [2]
StartAs early as 2027 (county); started (DCD, Nov 2) [3]

The data center planned in Hudspeth County

In October 2026 Hudspeth County confirmed a proposed data center by ServerDomes Global, a Boise, Idaho company, on private property in the Desert Haven community. KVIA put the value at about $15 billion[1]. In a letter to residents the county judge said the build would bring about 800 construction jobs over four to five years and 200 to 300 permanent jobs, and that the developer had not asked for a tax abatement[2].

DatacenterDynamics later described the campus, at a site it called Hueco Ranch, as a 350 MW development of up to ten domed buildings on about 700 acres of a 2,000-acre property, with behind-the-meter natural gas power and closed-loop cooling. It reported the cost at $10 billion and named Kaufman & Company in connection with the project[3].

Has construction started?

The two sources differ. The county judge wrote on Oct. 9 that construction could begin as early as 2027[2]. DCD reported on Nov. 2 that construction has already started[3]. Both may be true if early site work is under way ahead of the main build. Until the county or the developer posts a schedule, treat the heavy construction as a 2027 event and plan housing to match.

Inquire Planning beds for a crew here? Tell us the headcount.

Power, water, and roads

The judge’s letter says the campus will make its own power and will draw water once, at startup, rather than continuously. It also says project crews helped grade private roads, the landowner is donating caliche, and road-use agreements with the county were being discussed[2]. That matters to anyone hauling units in: county road terms may set when and how heavy loads can move.

Where crews would stay

Desert Haven lies east of El Paso. Horizon City is about 32 road miles away and central El Paso about 36; to the southeast, Fort Hancock is about 67 and Sierra Blanca about 76[4]. El Paso has the hotel rooms, but a 30-plus mile commute each way adds up over a four-to-five-year build[2]. Owned units near the site cut that drive. For the Meta build on the other side of El Paso, see El Paso data center crew housing.

For contractors bidding the domes

A sub on a multi-year desert job needs beds that hold up to heat and dust and stay put. We build crew units in Breckenridge, TX and set them turnkey on land you lease or own near Desert Haven or Horizon City. Mixes to consider:

  • A 40-person civil and foundation crew on a caterer: six seven-room sleepers and a dining unit.
  • Electricians and gas-plant crews on rotating shifts: five-room sleepers, one private room per worker.
  • Superintendents through a four-to-five-year build: suite units with kitchens.

Units: 16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)7-Room High-Density Sleeper16×76 4-Suite Unit (Four Full Kitchens)

For Hudspeth County landowners

Private land in far West Texas is often the only place a crew can stay close to the work. If you buy units to host a contractor, you own them; we don’t lease or run sites. Septic in unincorporated Texas is permitted by the state rules for on-site sewage, sized by the beds you set[6]. Hosting three or more workers for more than three days can make the site subject to TDHCA licensing[5]. Water on this site is a known issue[2], so line up supply before you order.

The haul west

Desert Haven is about 478 road miles from our Breckenridge plant[4]. Each unit rolls on its own axles under a TxDMV oversize permit[7], and any county road-use terms apply on the last stretch[2].

Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.

Common questions

Who is building the Hudspeth County data center?

ServerDomes Global, based in Boise, Idaho, on private property in the Desert Haven community, according to the county and KVIA.

How much is the Desert Haven data center worth?

KVIA and the county put it at about $15 billion in October 2026. DatacenterDynamics reported $10 billion for a 350 MW campus in November.

How many construction workers will the Hudspeth data center need?

The county judge’s letter says about 800 construction jobs over four to five years, plus 200 to 300 permanent jobs.

When does construction start in Hudspeth County?

The county judge said as early as 2027. DatacenterDynamics reported in November 2026 that construction had already started. Neither has published a full schedule.

Can I rent a bed near Desert Haven from Workforce Housing Direct?

No. We don’t rent beds or run camps. We sell new crew units to contractors and landowners who house their own crews.

Will the Hudspeth data center use county water?

The county judge wrote that it will draw water once at startup and make its own power on site.

Sources

  1. KVIA, “Hudspeth County confirms $15 billion proposed data center” (Oct 9, 2026)
  2. Hudspeth County Judge, message to residents regarding the data center (PDF) (Oct 9, 2026)
  3. DatacenterDynamics, “ServerDomes breaks ground on domed data center campus outside El Paso, Texas” (Nov 2, 2026)
  4. OpenStreetMap routing (OSRM), road miles between town centers (mapped Nov 20, 2026)
  5. TDHCA Migrant Labor Housing Facility license application (2+ families or 3+ workers for more than 3 days; application fee set on the current form) (checked Oct 2026)
  6. TCEQ, On-Site Sewage Facilities (septic) permitting (checked Nov 20, 2026)
  7. TxDMV Oversize/Overweight permits (checked Oct 2026)

Last updated 2026-11-20. Figures are as published by each source on the date shown; re-check before you budget.

Inquire Tell us your headcount, site, and start date.

Related

Data center workforce housing Texas project tracker Stargate AbileneVantage FrontierWheeler County workforce hub (Pampa data center)Haskell County data center (Maverick Workforce Hub)Childress data centers (IREN and Crusoe)Galaxy Helios (Afton)Fermi America Project MatadorGoodnight campus (Claude)

Inquire about crew housing near Desert Haven

Our team replies within one business day.

What happens after you inquire

  1. Our team reviews your project details and replies within one business day.
  2. We contact you to confirm your needs: headcount, site, and schedule.
  3. We prepare options for your project.