(830) 354-6730 Inquire

We sell crew housing units to companies and landowners. We don’t rent rooms or beds.

Home › Texas › North Texas › Sherman

Crew housing for Sherman semiconductor construction

We sell crew housing units to companies and landowners. We don’t rent rooms or beds.

Sherman’s first big fab build is done: Texas Instruments started production at its SM1 fab in December 2025. The next wave depends on demand. TI’s site has room for up to four fabs and posted construction roles in October 2026, and GlobalWafers can grow its wafer plant to six phases. Contractors with a long scope here can own crew units near the work instead of renting by the night.

What is happening locally

Two chipmakers drive construction in Sherman. Texas Instruments began production at SM1 on Dec. 17, 2025, three and a half years after breaking ground. The mega-site has room for up to four connected fabs, built and equipped as demand calls for them, and up to 3,000 direct jobs. A TI construction manager posting dated Oct. 19, 2026 describes the Sherman project as being in the early phases of building construction and utility installation.

GlobalWafers finished the first production phase of its 300mm wafer plant in 2025. Its chair said in January 2026 that the site has room for six phases and that a decision on phase two would come in the second half of the year. In July 2026 Micron signed a $500 million, 10-year supply deal tied to the plant, which then had about 250 employees.

Both companies were recruiting technicians at a Fannin County career fair on Oct. 15, 2026. That is plant staffing, not construction, but it shows the pull on local housing. The honest read: the SM1 construction peak has passed, and the next crew surge will follow the next fab or phase. Crews that land a long scope here are a good fit for owned units.

Road miles from the build site

Sherman and Van Alstyne are each about 169 road miles from Breckenridge, TX. Denison is about 177 and Howe about 180.

Not a crew lead? We only sell units to employers, so an individual worker can’t rent a room from us.

Permits and site in Sherman

Inside Sherman city limits, start with City of Sherman planning on zoning and any special-use permit. In unincorporated Grayson County, septic systems need a permit and an Authorization to Construct from the Grayson County Development Services OSSF division under TCEQ OSSF rules. Oversize loads move on TxDMV permits. Ask early whether your site requires HUD-code units.

Suggested units for Sherman

  • Electrical or piping crew of 30: 6 × 5-bed crew units
  • Commissioning team on a long scope: 4-suite full-kitchen units
  • Sites that require a HUD label: HUD-code 5-bed units

16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)16×76 4-Suite Unit (Four Full Kitchens)16×60 4-Suite Kitchenette Unit

Road miles to Sherman

Sherman is about 169 road miles from our Breckenridge plant.

Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.

Common questions

Is Texas Instruments still building in Sherman?

SM1 started production in December 2025. TI’s site has room for up to four fabs built as demand calls for them, and an Oct. 19, 2026 TI posting describes early building construction and utility installation on the Sherman project.

Is GlobalWafers expanding in Sherman?

It may. GlobalWafers said in January 2026 that its Sherman site has room for six phases and that a phase-two decision would come in the second half of 2026. Micron signed a $500 million, 10-year supply deal in July 2026.

Where do septic permits come from outside Sherman?

In unincorporated Grayson County, the county’s Development Services OSSF division issues septic permits. Do not start work until you have its Authorization to Construct.

Do you work for TI or GlobalWafers?

No. We sell new crew units to contractors and landowners who want their own housing near the work.

Can I rent a room or bed in Sherman?

No. We don’t keep a room list for Sherman semiconductor crews. Workers should check with their employer; we sell units to the companies running those jobs.

Sources

  1. Texas Instruments, “TI begins production at its newest 300mm semiconductor manufacturing facility in Sherman, Texas” (Dec 17, 2025)
  2. Texas Instruments job posting, Sr. Construction Manager (Sherman, TX), as listed on Yabot Jobs (Oct 19, 2026)
  3. Taipei Times, “GlobalWafers prepares for expansion” (Jan 22, 2026)
  4. KXII, “Micron signs $500M, 10-year deal with GlobalWafers in Sherman” (Jul 9, 2026)
  5. KTEN, “Sherman tech giants seek workers in Fannin County” (Oct 15, 2026)

Last updated 2026-10-28. Figures are as published by each source on the date shown; re-check before you budget.

More in the North Texas: North Texas overview Red Oak

Inquire about crew units for Sherman

Our team replies within one business day.

What happens after you inquire

  1. Our team reviews your project details and replies within one business day.
  2. We contact you to confirm your needs: headcount, site, and schedule.
  3. We prepare options for your project.

See our privacy policy.