Quanah data center crew housing for Integra’s Clocktower campus
We sell crew housing units to companies and landowners. We don’t rent rooms or beds.
Final schedules depend on site work, permits, and utilities. How fast we can deliver · Timeline · Bulk orders · Inquire
The Quanah campus in brief
| Location | Outside Quanah, Hardeman County · Texas Panhandle |
|---|---|
| Developer | Integra Mission Critical [2] |
| Campus | 756 MW; $6.7 billion total capital investment (Integra) [2] |
| Building filing | Clocktower - NWB 05: $8 billion, 288,355 sq ft, JHET Architects [1] |
| Schedule | Nov 1, 2026 to Dec 31, 2028; crews mobilized Oct 22, 2026 [1] |
| Cooling | Closed-loop, with an on-site substation [1] |
| Contractor | Not named publicly [1] |
| Local strain | Sewers pumped around the clock as RV parks filled (May 2026) [4] |
What Integra is building near Quanah
Integra Mission Critical is developing a 756 MW data center campus in Hardeman County, outside Quanah. The company’s project site puts the total capital investment at $6.7 billion[2]. A separate state accessibility (TDLR) filing dated Oct. 27, 2026 registers a single building on the campus, called “Clocktower - NWB 05,” at an estimated $8 billion. Baxtel, which reported the filing, notes the gap between the two figures[1].
That filing describes a 288,355 sq ft pre-engineered metal building designed by JHET Architects, with work scheduled from Nov. 1, 2026 through Dec. 31, 2028. The owner of record is 19000-200 Holdings LLC, listed at Integra’s Dallas address. Earlier, in August, the state Comptroller’s register of qualifying data centers added “Clocktower Quanah,” with Osprey Land Holdings as owner and Paile LLC as operator[1].
Baxtel reports that crews mobilized on Oct. 22, that the design uses closed-loop cooling and an on-site substation, and that no utility, general contractor, or tenant has been named publicly[1].
Why beds are tight in Hardeman County
Quanah is a small county seat, and it is already absorbing outside workers. At a public meeting in May 2026, KFDX reported, a city council member said city crews had been pumping sewers around the clock for six to eight months as RV parks filled with workers[4]. Water is a second constraint: Baxtel, citing KAUZ, reported that Greenbelt Reservoir stood at 4.7% in September and that Quanah was under a boil-water notice[1].
Integra’s own jobs page says construction will be the largest temporary workforce on the project and lists the skilled trades it expects to need[3]. No headcount has been published, so plan around the two-year building schedule rather than a rumored number.
Inquire Planning beds for a crew here? Tell us the headcount.
The project hasn’t peaked yet
This campus is early. Site crews arrived in late October and the registered building schedule only began on Nov. 1, 2026[1]. Most of the trade labor on a job this size arrives after the shell goes up, which on this schedule means 2027 and 2028. A company that buys beds now has time to permit a pad before the crowd shows up.
Where Quanah crews stay
There is no published worker camp for the Integra campus. Crews have been landing in RV parks in and around Quanah[4], and the next motels sit in towns a short drive out: Chillicothe about 14 road miles east, Crowell about 22 miles south, and Childress about 29 miles west on US 287[5]. Childress has its own data center crowd, so beds there are contested too; see Childress crew housing.
If you are a worker, your employer decides where you sleep. If you are the employer, the choice is RV spaces you rent from someone else or units you own on land you control.
For subcontractors on the Clocktower build
A sub carrying a long scope through 2028 can put its own beds on leased land near Quanah, Chillicothe, or Crowell. We build the units new in Breckenridge, TX and deliver them turnkey: hauled, set, and connected to utilities under one contract. Mixes that fit this job:
- Electricians and pipefitters on split shifts: five-room sleepers so night crews sleep in private rooms.
- A 30-person civil crew that cooks for itself: six shared-kitchen crew units with five beds each.
- Commissioning leads staying through 2028: suite units with full kitchens.
Units: 16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)7-Room High-Density Sleeper16×76 4-Suite Unit (Four Full Kitchens)
For Hardeman County landowners
Own acreage near Quanah and want to host crews? You can buy units outright and run the site yourself; we sell, we don’t lease or manage. Sort out wastewater before anything ships. Outside city limits a septic system needs a state-rule permit sized to the bed count[7], and housing three or more workers for more than three days can trigger a TDHCA migrant labor housing license[6]. Given the town’s sewer and water strain[4][1], ask early whether any city tie-in is possible. See crew housing for RV park and camp operators.
From Breckenridge to Quanah
Quanah is about 142 road miles from our Breckenridge plant[5], close enough to deliver in waves as the crew grows. Each 16 ft wide unit rides on its own axles under a TxDMV oversize permit[8]. For the Google build one county east, see Vernon crew housing.
Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.
Common questions
Who is building the Quanah data center?
Integra Mission Critical is the developer. A state filing lists 19000-200 Holdings LLC at Integra’s Dallas address as owner of the Clocktower building, and JHET Architects as designer. No general contractor has been named.
How big is the Integra campus in Hardeman County?
Integra describes 756 MW and $6.7 billion. One registered building, Clocktower - NWB 05, is filed separately at $8 billion and 288,355 sq ft.
When does construction on the Clocktower building run?
The TDLR filing schedules it from Nov. 1, 2026 to Dec. 31, 2028. Baxtel reported crews mobilizing on Oct. 22, 2026.
Where do workers on the Quanah job sleep?
Mostly in RV parks around Quanah so far, plus motels in Chillicothe, Crowell, and Childress. No company camp has been announced. Your employer arranges lodging, so check with your foreman.
Can I rent a bed in Quanah from Workforce Housing Direct?
No. We don’t run a camp in Hardeman County or anywhere else. We manufacture crew units and sell them to contractors and landowners who then house their own people.
Is water a problem for housing crews in Quanah?
It can be. Greenbelt Reservoir was reported at 4.7% in September 2026, with a boil-water notice in Quanah. Plan wastewater and water supply for any camp before ordering units.
Sources
- Baxtel, “Integra files $8B building at 756MW Quanah data center campus in Texas” (TDLR filing and Comptroller register) (Nov 9, 2026)
- Quanah Data Center (Integra Mission Critical), project page (checked Nov 19, 2026)
- Quanah Data Center (Integra Mission Critical), jobs page (checked Nov 19, 2026)
- KFDX/Texoma’s Homepage, “Crowell, Quanah residents voice data center project fears” (May 20, 2026)
- OpenStreetMap routing (OSRM), road miles between town centers (mapped Nov 19, 2026)
- TDHCA Migrant Labor Housing Facility license application (2+ families or 3+ workers for more than 3 days; application fee set on the current form) (checked Oct 2026)
- TCEQ, On-Site Sewage Facilities (septic) permitting (checked Nov 19, 2026)
- TxDMV Oversize/Overweight permits (checked Oct 2026)
Last updated 2026-11-19. Figures are as published by each source on the date shown; re-check before you budget.
Inquire Tell us your headcount, site, and start date.
Related
Data center workforce housing Texas project tracker Stargate AbileneVantage FrontierWheeler County workforce hub (Pampa data center)Haskell County data center (Maverick Workforce Hub)Childress data centers (IREN and Crusoe)Galaxy Helios (Afton)Fermi America Project MatadorGoodnight campus (Claude)
What happens after you inquire
- Our team reviews your project details and replies within one business day.
- We contact you to confirm your needs: headcount, site, and schedule.
- We prepare options for your project.
See our privacy policy.