Crew housing near Vernon for Google’s Project Rise
We sell crew housing units to companies and landowners. We don’t rent rooms or beds.
Final schedules depend on site work, permits, and utilities. How fast we can deliver · Timeline · Bulk orders · Inquire
Project Rise at a glance
| Location | FM 2897 South, southeast of Vernon, Wilbarger County · North Texas |
|---|---|
| Rise 1A filing | $500 million, 991,000 sq ft; Mar 31, 2026 to Mar 31, 2028 [1] |
| Rise 2A | Same address, size, and schedule; about $1 billion combined [2] |
| Owners of record | Planton Investments LLC and Platon Investments LLC, at Google’s headquarters address [2] |
| Design firm | Kimley-Horn [1] |
| Cooling and power | Air-cooled; next to new AES clean power [3] |
| Planned on-site population | About 2,215 (wastewater design assumption, not a job count) [4] |
| Nearby camps | About 50 mobile homes east of Electra; Project Drover planned for about 4,500 near Oklaunion [8] |
What is being built outside Vernon
Google is building two data centers on FM 2897 South, southeast of Vernon in Wilbarger County, under the names Project Rise 1A and Project Rise 2A. The state accessibility filing for Rise 1A lists a $500 million, 991,000 sq ft data center with mechanical and electrical yards, a security entrance, and utilities, with work starting March 31, 2026 and finishing March 31, 2028[1]. Rise 2A is filed at the same address with the same size and schedule, so the two carry about $1 billion in estimated construction value[2].
The filings name the owners as Planton Investments LLC and Platon Investments LLC, both at Google’s Mountain View headquarters address[1][2]. Kimley-Horn is listed as the design firm (spelled “Kimberly - Horn” in the Rise 1A record)[1]. Google says the campus is air-cooled, limiting water use to things like kitchens, and that it sits next to new clean power built by AES[3]. We found no general contractor named in any public filing or Google statement, so we don’t name one.
How many people the site is planned for
No headcount has been published. The closest public numbers are engineering assumptions. Platon’s first proposed wastewater plant near Oklaunion was sized for about 2,215 people on site around the clock, and a second, separate plant for about 440. The Vernon Daily Record notes that the second (WWTP 2) application does not name Google, Project Rise, or a data center, and that these are design figures, not job counts[4].
Hiring is visible, though. Workforce Solutions North Texas held a construction and skilled-trades job fair for the Oklaunion data center build on Nov. 3, 2026, at the Wilbarger County Auditorium in Vernon[6]. At an October open house, Google’s public affairs manager told residents, “We plan on being here for the next 30 years,” and Vernon’s mayor pointed to a $4.5 million Google contribution to repair an aging city water line[5].
Inquire Planning beds for a crew here? Tell us the headcount.
Where do Project Rise crews stay?
Mostly not in Vernon, and the beds are spread across two counties. Here is what is on the public record:
- East of Electra. In July 2026, Wichita County approved names for private roads off Old Gun Club Road North serving a first phase of about 50 mobile homes for data center workers[8].
- Near Oklaunion. A proposed camp called Project Drover, filed with the state as Red River Rise Lodge, plans housing and services for about 4,500 people on roughly 272.57 acres outside city limits, about 4.6 miles from a construction site labeled “RSE.” The TCEQ figure is an infrastructure planning number, and the filings do not name Google as the customer[9]. The TDLR record lists a $160 million, 62,207 sq ft workforce housing project owned by 3GB Land Series 2026V, with Kimley-Horn as design firm[10].
- Wichita Falls. About 50 road miles east of Vernon[13]. The owners of a planned 176-site RV resort off Jacksboro Highway said workers from construction projects in the Oklaunion area are already staying in the city[11], and in April 2026 the city’s planning commission proposed rules for temporary workforce housing, pending commission and council approval: a conditional use permit, one-year permits with extensions, and the site returned to its prior condition within six months[12]. Check current status with the city.
The honest answer for a worker: your employer assigns the bed, so ask your foreman or HR. For a company, the choice is a bed in someone else’s camp or units on land you control.
For subcontractors on the Rise build
A sub with a long scope on a two-building, two-year job can own its beds. We build crew units in Breckenridge, TX, haul them to land you lease near Vernon, Oklaunion, or Electra, set them, and hook up utilities under one contract. Typical mixes for this job:
- Electrical and mechanical crews working day and night shifts: five-room sleepers, one private room per worker.
- A crew of 25 that cooks for itself: five 5-bed crew units with shared kitchens.
- Superintendents and commissioning staff who stay through 2028: suite units with their own kitchens.
Units: 16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)7-Room High-Density Sleeper16×76 4-Suite Unit (Four Full Kitchens)
For Wilbarger and Wichita County landowners
If you own land near FM 2897 or along US 287 and want to host crews, you can buy new units and run them yourself. We sell; we don’t lease, and we don’t manage camps. Plan the permits before the units: outside city limits, septic systems need state-rule permits sized for the bed count, and housing three or more workers for more than three days may need a TDHCA migrant labor housing license[14]. Inside Wichita Falls, temporary-housing rules were proposed in April 2026[12]; check their status with the city. See crew housing for RV park and camp operators.
From Breckenridge to Vernon
Vernon is about 113 road miles from our Breckenridge, TX plant[13]. Each 16 ft wide unit moves on its own TxDMV oversize permit[15], and the same crew that hauls it sets it and connects utilities. For the next markets up US 287, see Quanah’s Integra campus and Childress crew housing.
Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.
Nearby town guides
Red Oak: permits, parking, and road miles · Sherman: permits, parking, and road miles
Common questions
What is Project Rise in Vernon, TX?
Two Google data centers, Project Rise 1A and 2A, on FM 2897 South in Wilbarger County. Each is filed as a $500 million, 991,000 sq ft building, with work scheduled from March 31, 2026 to March 31, 2028.
How many workers are building the Vernon data center?
Google has not published a count. Wastewater plans filed near Oklaunion were sized for about 2,215 people on site around the clock, plus a second plant for about 440, but those are design assumptions, not job numbers.
Where do data center workers stay near Vernon?
A camp of about 50 mobile homes is being set up east of Electra, a 4,500-person camp called Project Drover is proposed near Oklaunion, and some workers are staying in Wichita Falls. Your employer assigns beds, so ask your foreman or HR.
Who is the general contractor on Project Rise?
No general contractor is named in the public filings or Google’s announcements we found. The filings list Kimley-Horn as design firm and Planton and Platon Investments LLC, at Google’s headquarters address, as owners.
Can I rent a bed from Workforce Housing Direct in Vernon?
No. We don’t rent rooms or beds. We build and sell new crew units to contractors and landowners. If that is your company, Inquire.
Can a landowner near Oklaunion or Electra put crew units on their land?
Often, outside city limits, with a septic permit sized for the beds and, for three or more workers staying over three days, a possible TDHCA license. Inside Wichita Falls, rules for temporary workforce housing were proposed in April 2026; check their status with the city.
Sources
- TDLR TABS registration TABS2026025053, “Project Rise 1A,” FM 2897 S, Vernon (Wilbarger County) (registered Jul 11, 2026; checked Nov 9, 2026)
- DCD, “Google files for two data centers in Vernon, Texas” (Jul 20, 2026)
- Google, “We’re expanding our Texas presence with a new data center and clean energy in Wilbarger County” (Feb 24, 2026)
- The Vernon Daily Record, “Second wastewater plant permit for Platon Investments LLC pending approval” (Aug 25, 2026)
- KAUZ News Channel 6, “Google holds open house for Wilbarger County data center project” (Oct 14, 2026)
- Workforce Solutions North Texas, “Job Fair: Construction & Skilled Trades” (Oklaunion data center construction) (Nov 3, 2026 event; checked Nov 9, 2026)
- Wichita Falls Times Record News via USA Today, “Another big data center is headed for the Wichita Falls area” (Jul 13, 2026, updated Jul 14)
- Wichita County Commissioners Court, minutes of the regular session, item 26.0714.277 (Jul 14, 2026)
- Texas Construction Media, “Project Drover Plans a 4,500-Person Workforce Camp Near Vernon” (Sep 12, 2026)
- TDLR TABS registration TABS2027000823, “Project Drover” / Red River Rise Lodge (registered Sep 11, 2026; checked Nov 9, 2026)
- RoamingRV (republishing the Times Record News), “Owners say work will start soon on a luxury RV park in Wichita Falls” (Oct 8, 2026)
- Times Record News via AOL, “City of Wichita Falls prepares for surge of data center workers” (Apr 16, 2026)
- OpenStreetMap routing (OSRM), road miles between town centers (mapped Nov 9, 2026)
- TDHCA Migrant Labor Housing Facility license application (2+ families or 3+ workers for more than 3 days; application fee set on the current form) (checked Oct 2026)
- TxDMV Oversize/Overweight permits (checked Oct 2026)
Last updated 2026-11-09. Figures are as published by each source on the date shown; re-check before you budget.
Inquire Tell us your headcount, site, and start date.
Related
Data center workforce housing Texas project tracker Stargate AbileneVantage FrontierWheeler County workforce hub (Pampa data center)Haskell County data center (Maverick Workforce Hub)Childress data centers (IREN and Crusoe)Galaxy Helios (Afton)Fermi America Project MatadorGoodnight campus (Claude)
What happens after you inquire
- Our team reviews your project details and replies within one business day.
- We contact you to confirm your needs: headcount, site, and schedule.
- We prepare options for your project.
See our privacy policy.