The Long Mott station in brief
| Location | Dow Seadrift Operations, Calhoun County · Coastal Bend |
|---|---|
| Owner | Long Mott Energy LLC, a Dow subsidiary [1] |
| Reactors | Four Xe-100, 80 MWe / 200 MWt each, up to 320 MWe [1] |
| Permit | NRC construction permit CPAR-3, Nov 9, 2026 [5] |
| Decision | Dow board review pending; preliminary investment decision expected 2027 [3] |
| Construction jobs | 1,500+ in Calhoun County [4] |
| Energy delivery | Targeted early 2030s [1] |
| Status | Not under construction as of Nov 20, 2026 [2] |
What Dow and X-energy have proposed
Long Mott Energy, a Dow subsidiary, plans a nuclear power station at Dow’s Seadrift Operations in Calhoun County. The design is four X-energy Xe-100 reactors at 80 MWe and 200 MWt each, up to 320 MWe in total, to supply power and steam to the chemical plant. The Department of Energy calls it the first construction permit the NRC has issued for a reactor at an industrial site, and the project targets energy delivery in the early 2030s[1].
The NRC issued the construction permit on Nov. 9, 2026[1], and the Federal Register notice lists it as CPAR-3[5].
This project hasn’t started yet
A permit is not a decision to build. Dow says its board still has to review the project, and that if it is approved, construction could begin later this decade[2]. X-energy says a preliminary investment decision is expected in 2027, with full construction following a final investment decision[3]. As of Nov. 20, 2026 the reactors are not under construction and the project is not yet approved to build. Every housing plan here is a plan for a project that may or may not go ahead.
Inquire Planning beds for a crew here? Tell us the headcount.
How many workers, if it goes ahead
Texas County Progress reported more than 1,500 construction jobs in Calhoun County and up to 100 permanent jobs at the station[4]. If the project goes ahead, that workforce will need beds within commuting range of Seadrift.
Towns around Seadrift
Seadrift is a small bay town. Port Lavaca, the county seat, is about 18 road miles away and Victoria, with the region’s larger hotel stock, about 33[6]. For the rest of the region, see Coastal Bend crew housing and housing power plant crews.
Getting ahead of a nuclear build
Nobody should buy beds for this job until there is an investment decision. What contractors can do now is work out the mix and the site so an order can move quickly if the board says yes. We build units in Breckenridge, TX and set them turnkey. Typical mixes for a plant job:
- Craft crews on long shifts: five-room sleepers with one private room each.
- QA, engineering, and vendor staff staying for years: four-suite units with full kitchens.
- A 50-person crew on a caterer: seven-room sleepers and a dining unit.
Units: 16×76 5-Bed, 5-Bath Crew Unit (Shared Kitchen)16×76 5-Room Sleeper (No Kitchen)7-Room High-Density Sleeper16×76 4-Suite Unit (Four Full Kitchens)
For Calhoun County landowners
Land near Seadrift or Port Lavaca that can take septic and power is worth checking now. If a contractor wants to host its crew there, you or they buy the units; we don’t lease or manage. A rural site in Texas needs a state on-site sewage permit matched to its bed count[8], and the TDHCA migrant labor housing rules can cover sites that house three or more workers for over three days[7]. Coastal floodplain and wind rules apply too; see wind zones on the Gulf Coast.
Distance from the plant
Seadrift is about 371 road miles from Breckenridge[6]. Units travel one per truck on their own axles under TxDMV oversize permits[9].
Approximate road miles from Breckenridge, TX, mapped with OpenStreetMap routing (OSRM) on Oct 19, 2026. Oversize routes can be longer.
Nearby town guides
Corpus Christi and Gregory: permits, parking, and road miles
Common questions
Is the Seadrift nuclear plant being built?
Not yet. The NRC issued a construction permit on Nov. 9, 2026, but Dow says its board must still review the project. X-energy expects a preliminary investment decision in 2027.
What reactors are planned at Long Mott?
Four X-energy Xe-100 reactors, each 80 MWe and 200 MWt, up to 320 MWe in total, at Dow’s Seadrift Operations.
How many construction jobs would the Long Mott station create?
Texas County Progress reported more than 1,500 construction jobs in Calhoun County and up to 100 permanent jobs.
When could construction start at Seadrift?
Dow says that if its board approves, construction could begin later this decade. Full construction follows a final investment decision.
Can I rent a room in Seadrift from you for the nuclear project?
No. We sell crew units to companies and landowners and have no rooms to rent. There is no camp for this project.
Why is the Long Mott permit a first?
The Department of Energy says it is the first NRC construction permit for a reactor at an industrial site.
Sources
- U.S. Department of Energy, “Dow, X-energy receive construction permit for advanced nuclear project in Texas” (Nov 13, 2026)
- Dow, “Dow’s Long Mott Generating Station receives NRC construction permit” (Nov 2026)
- X-energy, “Dow-X-energy proposed SMR project receives historic construction permit” (Nov 9, 2026)
- Texas County Progress, “Calhoun County: cutting-edge nuclear” (checked Nov 20, 2026)
- Federal Register, Long Mott Energy LLC; Long Mott Generating Station construction permit (Nov 12, 2026)
- OpenStreetMap routing (OSRM), road miles between town centers (mapped Nov 20, 2026)
- TDHCA Migrant Labor Housing Facility license application (2+ families or 3+ workers for more than 3 days; application fee set on the current form) (checked Oct 2026)
- TCEQ, On-Site Sewage Facilities (septic) permitting (checked Nov 20, 2026)
- TxDMV Oversize/Overweight permits (checked Oct 2026)
Last updated 2026-11-20. Figures are as published by each source on the date shown; re-check before you budget.
Inquire Tell us your headcount, site, and start date.
Related
What happens after you inquire
- Our team reviews your project details and replies within one business day.
- We contact you to confirm your needs: headcount, site, and schedule.
- We prepare options for your project.
See our privacy policy.